Preparation for steel structure installation of prefab industrial buildings

Time:[2022-3-14]  Hits:2675

With the continuous development of economy, diversified architectural structures have entered our daily life. Develop prefabricated buildings such as prefabricated concrete structure, steel structure and modern wood structure according to local conditions. Steel structure prefabricated buildings are widely used in different types of fields such as industry, commerce, agriculture and so on. The fast installation method is conducive to the rapid completion of the industry and get a good development trend.

The contents and requirements of steel structure installation preparation of prefab industrial buildings are the same as those of ordinary steel structure installation works. During the construction of steel column foundation, the positioning and protection of anchor bolts shall be done well, and the top elevation of foundation and anchor bolts shall be controlled. After foundation construction, inspection and acceptance shall be carried out according to the following contents:

(1) Whether the axis position of each row and column is correct;

(2) Whether the span of each span meets the design requirements;

(3) Whether the elevation of foundation top meets the design requirements;

(4) Whether the position and elevation of anchor bolts meet the design and specification requirements.

Before the hoisting of components, the shape and section geometric dimensions of components shall be inspected according to the relevant provisions in the <<Code for construction and acceptance of steel structure engineering>> and the deviation shall not exceed the value specified in the specification; The components shall be numbered according to the requirements of the design drawings, highlighting the installation center mark. The center mark and elevation mark in two directions shall be popped up for the steel column; Mark the position of binding point; The length of the column should be measured, and the length error should be recorded in detail. It should be written on the plane beside the center mark of the lower part of the column with oil pen, so that it can be adjusted in the two grouting layer of the top elevation of the foundation.

Components entering the construction site must have quality assurance and detailed acceptance records; It shall be stacked in the designated area according to the type, model and installation sequence of components. Enough supporting surface shall be provided for the component stratum skid to prevent the fulcrum from sinking; When components of the same model are stacked, the fulcrum of each layer of components shall be on the same straight line; The deformed components shall be corrected in time and can be installed only after passing the inspection.

Following the contents of the specification, the construction party effectively prepares for installation and provides favorable conditions for the installation of the main steel structure of the prefab industrial buildings. For the construction of steel column foundation, implement the work details and do the work well, which is more conducive to the later installation of steel structure. The normal use of prefab industrial buildings is closely related to the installation preparation. Relevant construction party shall make preparations for the installation of prefab industrial buildings.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
成人乱码一区二区三区av| 人禽杂交18禁网站免费| 把腿杠起横冲直撞| 大黑屌高潮女神| 伊人网熟妇荡妇| 被黑人超巨轮奸强奸视频| 国产成人精品三级在线中文 | 日本高清视频在线网站不卡| 国产成人精品区一区二区| 高清性三级交视频在线观看| 男人大鸡巴插女人逼试屏| 美女被大肉棒插进去视频| 亚洲卡一卡二新区无人区| 免费靠妣色网站| 大屁股少妇一区二区三区| 精品老司机视频在线观看| 亚洲国产精品第一二三区| 粉嫩虎白扒开视频毛女片| 女被美国大鸡巴插逼视频| igao视频网在线视频| 肏肥熟妇要大黑鸡巴好爽| 国产99久久久国产精品潘金莲| 日日夜夜天天婷婷一区二区| 操逼操逼操大逼| 国产性做爰片免费视频看| 日本免税店比国内便宜多少| 美女胸大自慰在线草鸡巴| 精品人妻少妇一区二区三| 日韩无码专区| 亚洲第一在线无码啊AV| 日韩人体艺术大胆毛片基地| 最新国产v亚洲| 少妇被爽到高潮喷水| 鸡巴太硬,想操你逼视频| 男人操女人下面国产剧情| 人妻小慧办公室沉伦全文番外篇| 久久碰人妻一区二区三区| 日本三级黄国产| 男人大鸡巴造女人皮视屏| 91资源视频网站在线观看| 又爽又摸又日视频在线观看|