Importance of structural design of multi-storey prefabricated workshop building

Time:[2022-4-29]  Hits:2643

In recent years, with the development of the diversity of the world economy, the industrial production of various countries and regions has also been continuously improved, and the complexity of the process layout is a revolutionary change for the industrial workshop buildings with single production function and simple building layout in the past; At the same time, the popularization of computers and the integration and simplification of structural calculation software have solved the complex and cumbersome structural calculation problems. As a result, multi-storey and even high-rise productive industrial buildings with large span, large space and complex building layout have emerged. Under the background of such rapid development, the rational selection of building structure layout and design parameters has played an important role in structural design.

1. Characteristics of multi-storey prefabricated workshop building

1.1 plane structure layout and column grid layout

In the plane layout of multi-storey prefabricated workshop building, usually in order to meet the process requirements: the structural layout is irregular, the pole network is irregular, and the beam layout is irregular, so there is the phenomenon of opening holes on the main stressed components according to the process requirements. At the same time, the internal space of the workshop building is generally large, and the column spacing is mostly 6 ~ 12m; The same part has the design of pulling column; The column spacing will increase to more than 18m. This makes the force transmission of the structure complex, the force is not clear, and the phenomenon of stress concentration is easy to occur in the design.

1.2 vertical structure layout and floor height

The storey height of multi-storey prefabricated workshop building is large, which can reach 4 ~ 8m, and there are often staggered floors and interlayer in the vertical layout, and large holes are opened in the floor, which makes the floor unable to provide sufficient in-plane stiffness, and the effective mass of the structure is unevenly distributed along the vertical direction. Under the action of earthquake, the structure may produce "short column effect", which makes the horizontal shear force of local column section become the control factor of section design.

1.3 various types of loads

The concentrated load of industrial workshop building mainly includes the self weight of equipment, and sometimes the vibration disturbance of equipment needs to be considered, and the dynamic calculation is carried out according to the requirements of the specification. Suspension load mainly includes pipeline load and crane load, and sometimes the pipeline also produces horizontal load and bending moment. The plate surface load is mainly based on the requirements of production technology. There are different values of live load on the ground of different production buildings, but this kind of live load is generally greater than that in civil buildings.


1.4 floor and foundation form

The cast-in-situ reinforced concrete floor is generally adopted for the floor of industrial workshop building. However, due to the equipment load requirements proposed by the process, the floor may have holes or local thickness changes. The foundation form of the powerhouse mostly adopts the independent foundation under the column and the strip foundation under the column. If the bearing capacity of the foundation is low, the lime soil compaction pile, sand pile and other methods can be used to deal with it, or the cast-in-place pile can be used to act directly on the hard soil layer.

1.5 light envelope

Generally, the enclosure structure of industrial workshop building is not used as a load-bearing system, and light materials are usually used. The roof structure mostly adopts steel truss purlin system with light insulation layer. This light enclosure material is beneficial to reduce the self weight of the structure and reduce the seismic response.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
国产成人精品久久一区二区| 久久水蜜桃网成人网2区| 女高中生白丝被操翻高潮| 国产精品盗摄 偷窥盗摄| 亚洲最色最色最色的视频| 巨爆乳无码视频在线观看| 久久久久久妓女精品影院| 男人带套操女人黄色网站| 日本一级特黄大片做受图片| 欧美大鸡排男同射精视频| 鸡巴好大操爽片子看看你| 亚洲熟妇无码另类久久久| 日韩高清av一区二区三区| 99久久久999久久久| 大肉棒操逼动态视频过程| 亚洲国产99在线精品一区| 性色av乱码一区二区三区| 人美逼肥水滴滴| ww久久综合久中文字幕| 亚洲男同GV片在线观看| 性欧美极品XXXX另类| 想看看日逼片子| 18禁娇喘裸体高潮av| 天天躁久久躁中文字字幕| 精品日韩av专区一区二区 | 青青青青在线成人视99| 亚洲av蜜桃臀久久精品| 无码专区视?精品老司机| 久久精品亚洲男人的天堂| 久久WWW免费看成人片| 一区二区三区风骚黄色片| 国产伦一区二区精品视频| 日本不卡一区三区在线观看| 最新亚洲精品国自产在线| 插进你的小骚逼里面网站| 女人被男人操的视频网站| 人妻少妇精品一区毛二区| 男人的屌插女人的穴视频| 操小美女老师的小骚逼网| 欧美精品九九久久久久久久| 日本老女人久久中文字幕|