娇妻借朋友高h繁交h,公交车伦流澡到高潮hnp,六月婷婷网视频在线观看,天堂√最新版中文在线

Language:CHINESESENGLISH

Home > News > Problems needing attention in the process of steel structure construction
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.e-sosa.com

Problems needing attention in the process of steel structure construction

Time:[2022-8-29]  Hits:2384

The steel structure construction project has become more and more popular in recent years, and the problems to be paid attention to in the construction process are particularly important. Generally, many safety problems can be avoided only by the following points. Next, I'll talk to you.

 

First, the size of reinforcement holes shall be reserved before and after construction


In particular, the holes on the section steel can be as small as possible, so that the steel can have good strength. In addition, the loss of profile steel shall be reduced to facilitate construction. In addition, when drilling the steel structure, the two symmetrical sides of the reinforcement shall be taken into account. It is particularly noted that the edge of the reinforcement with a diameter greater than 25mm may increase the diameter of the reinforcement by 1 ~ 2mm.


Second, the position of reinforcement holes must be reserved in advance


When drilling, the upper, lower, left and right positions shall be aligned accurately, otherwise it will be very difficult to pass through the reinforcement. If the information of the construction party responsible for the construction of section steel is inconsistent with that of the civil construction party in the practice of steel structure construction, the two parties need to communicate in time during the construction process.


Third, installation details of bottom steel column


If the embedded steel column at the bottom is light, we can use machinery for lifting, and manual position calibration can be done. This has many advantages.


First, the accuracy of the mounting position can be ensured; Second, because the component processing plant has completed the foundation fabrication of the steel column, the center of the profiled steel column and the center of the base plate must be coincident during fabrication, so the corresponding outer contour is parallel; Third, use the tower crane or other auxiliary installation machinery to lift the foundation embedded column, and then slowly lower the foundation embedded column. In this way, the four corners of the column base plate are aligned with the contour line, and the base plate of the column base is on the mat. Striking while the iron is hot will save time and labor, and can greatly improve the progress of the steel structure construction.


In addition, we can calibrate the position of the foundation embedded column with the help of two theodolites. Then fix the two theodolites on the vertical and horizontal axes of the column, and then move the position of the column to make the front center line of the column coincide with the viewpoint of the two theodolites, which can ensure the verticality of the column.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
大香蕉视频精品在线观看| 猪的鸡吧插进女人的逼里| 日韩在线 中文字幕 欧美| 操必网站333| 一区二区亚洲午夜噜噜片| 免费的大鸡巴操小穴视频| av在线播放日韩亚洲欧| 看女生逼的网站| yy111111少妇无码理论片| 大鸡巴操小穴视频免费看| 屁股捅鸡巴的视频软件。| 欧美老妇激情xxxxxx按摩| 好好热精品视频在线观看| 嗯~啊~被弄到高潮视频| 日韩三级欧美一区二区三区| 高清4人妻一区二区三区| 午夜欧美精品久久久久久久| 丁香色婷婷国产精品视频| 美女被操的视频| 在线亚洲丁香五月天六月| 白丝jk美女被操逼网站| 欧美一级特黄大片做受国产| 国产亚洲观看视频在线a| 女警乳链乳环蒂环铃铛调教| 大鸡鸡插小骚逼免费网址| FREE性欧美HD另类精品| 成人午夜福利院在线观看| 少妇高潮喷水惨叫久久久| 小柔涂了春药被一群人轮| 美女少妇裸体AA级AA| 国产一区二区三区爆白浆| 色综合 图片区 小说区| 91人妻爽爽人人做人人澡| 99热思思干这里只有精品| 骚逼好难受要鸡巴插视频| 东北粗口国产床| 大伊人无码综合天堂Av| 国产第一综合另类色区奇米| 日韩一区二区三区视频在线| 制服丝袜国产在线第一页| 淫荡美女大鸡巴操逼视频|