娇妻借朋友高h繁交h,公交车伦流澡到高潮hnp,六月婷婷网视频在线观看,天堂√最新版中文在线

Language:CHINESESENGLISH

Home > News > Control of welding process elements in steel structure design engineering
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.e-sosa.com

Control of welding process elements in steel structure design engineering

Time:[2022-10-19]  Hits:1991

The steel structure planning project has extremely high strength, and better construction effect can be achieved when the plant floor is higher or the span is larger. However, many actual constructors in our country know little about the steel structure project, so they can't really grasp the welding key of the steel structure planning project, which has a certain impact on the final quality of the steel structure project. Therefore, in order to improve the construction quality of steel structure planning and construction, it is necessary to strictly control and control the welding part of the steel structure project to ensure the quality of the steel structure planning project and promote the continuous updating of the construction profession and construction skills.


1. Control of process factors


1.1 Control of pre welding preparation of steel structure planning project


Preparation before welding of steel structure planning mainly refers to groove preparation, welding equipment and cleaning of welding area.


(1) Preparation of groove: the processing of welding groove directly affects the quality of welding operation, so it should be operated strictly according to the steel structure planning process; Attention shall also be paid to the fact that the raw materials, specifications and types of the arc tab groove of the steel structure planning shall be the same as those of the base metal.


(2) Welding device: the device quality not only affects the dimensions of the steel structure planning components, but also has a certain impact on the weld formation. When welding the device, it is necessary to consider whether it is easy to weld after the device. If the device affects the normal welding of individual steel structure planning welds, it is necessary to weld this weld before installing other parts. All welding materials of the device shall match with the base metal, and the spot welding height shall not exceed 2/3 of the planned weld height of the steel structure.


(3) Cleaning of planned welding area of steel structure: oil stain, rust, dust, etc. on both sides of the joint shall be completely removed to prevent blowholes and cracks in the planned weld of steel structure.


1.2 Control of welding sequence


Selecting a reasonable welding sequence for steel structure planning can reduce the deformation degree of components and prevent the occurrence of cracks. Therefore, when selecting the welding sequence for steel structure planning, the welding seam should be in a relatively free shortening state as far as possible. The welding seam with a large shortening amount should be welded first, and then the welding seam with a small shortening amount, so as to ensure that the planned welding seam of steel structure has a large shortening freedom during welding and a small planned residual stress of steel structure occurs.


1.3 Control of welding process specification parameters


The welding process specification parameters of steel structure planning mainly include welding specification parameters, preheating temperature, post heat and hydrogen elimination treatment, post weld heat treatment, etc. The welding specification parameters are clearly specified in the process, and the steel structure planning workers should strictly follow the process. The selection of welding current and arc voltage for steel structure planning shall be emphasized. The current is too small and the arc is unstable, which is easy to cause slag inclusion, incomplete penetration and other defects; If the current is too large, undercut, air hole, welding and other defects are easy to occur, and they are added together by splashing. Long arc means high arc voltage, unstable arc burning, spatter addition, small penetration, and external air intrusion, which constitute the defects of air hole incomplete penetration.

 


The steel structure planning project is widely used in industry and public construction, and the welding process is the key process in the steel structure processing and manufacturing. Strengthening the quality control of the welding process can not only improve the quality of steel structure planning products, but also have a very important effect on the quality of the entire steel structure planning project. Based on this, this paper mainly discusses the key points of welding quality control in steel structure planning project.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
娇妻销魂的交换经历| 美女肉禽大鸡巴| 男女大鸡巴腹肌性爱网站| 日韩欧美在线视频观看不卡| 亚洲欧美一区二区爽爽爽| 男人JJ插女人屁眼视频| 嫩草影院网站无码进入。| 亚洲剧情东京热中文字幕| 久久免费视频人| 日韩国产精品电影在线观看| 久久久久久久久精品影院| 十八禁中国女性操B视频| japanese av| 中国GAysboy牲交| 婷婷久久夜色av桃色av| 日韩无字幕一区二区无字幕| 成人观看的无码免费视频| 黄色av网站在线免费播放| 日大眯眯DVD| 91久久青娱乐| 日小骚逼的视频| 日日摸天天爽天天爽视频| 亚洲欧美日韩国产一级A| 亚洲av综合色区无码另类小说| 亚洲AV无码久久精品老| 久久99精品国产综合毛片| 国产欧美日韩一区二区91| 久久综合久美利坚合众国| 黄背毛木耳功效与作用的| 无码乱人伦一区二区亚洲| 日韩av在线不卡一区二区| 智利男操美女穴| 99热国产在线精品99| 蜜桃尤物在线视频免费看| 久草视频无遮挡| 国产又黄又猛又粗又爽的a片动漫 可以看如何插进去的黄片 | 少妇P毛又多水又大又黑| 久久伊人不卡了精品酒店| 巜饥渴的少妇在线观看| 亚洲鲁丝片一区二区三区| 91热只有这里有欧美国产|