Engineering Technology: General requirements for inspection of steel structure engineering foundation

Time:[2015-1-14]  Hits:4780

Engineering Technology: General requirements for inspection of steel structure engineering foundation

     Steel installation before positioning axis response, infrastructure and elevation axes, bolt size and location of the building, such as review, and should be the basis for the handover inspection and acceptance. Such as anchor bolts required to review each bolt axis, elevation, to go beyond regulatory requirements, must take appropriate remedial measures. Such as increasing the size of the column bottom in the column base plate according to the actual location of re-drilling screws.
     When the transfer of basic engineering batches, each less than a handover acceptance column base can form the basis of the degree of spatial steel mounting unit and shall meet the following requirements: basic strength of concrete to meet the design requirements; tamp backfill around the foundation is completed; foundation the elevation and the datum axis signs and point accurate and complete; the top surface of the foundation should be flat base surface of the secondary should be watered at cutting hair, anchor bolts should be intact.
The column axis bomb test in place of the column base surface.
     The column base level for leveling. Pouring concrete column base elevation is generally reserved for 50 to 60 mm (compared with steel column base design elevation), the installation is a steel plate or take advance using slurry leveling boards.
     When using the steel plate to make the support plate, the steel plate in the area before the bottom of the column should be secondary grouting withstand tensile load and bolt tightening calculated and determined according to the following compressive strength of concrete foundation, columns soles of the feet. Base plate and the contact surface and the bottom surface of the column should be smooth, tight.
     When the syrup should be used to sit for the board using non-shrink mortar, mortar pad before lifting pillar strength should be higher than a grade basis of concrete strength and mortar pad area should be sufficient to meet the requirements of hosting.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
日韩精品极品视频在线观看免费| 男插进女生下面免费视频| 操黑丝淫妇在线免费视频| www视频在线观看视频| 以吾之名在线观看| 国产另类ts人妖一区二区| 大鸡巴操屄短片| 亚洲精AA在线观看网站| 东北妇女好大的BBBB| 国产妇精品伦一这二区三| 十八禁无遮无拦视频免费| 老司机成人精品免费视频| 操骚逼爽死了插到哭视频| 伊人av超碰伊人久久久| 国产精品xxxx国产喷水| 欧洲精品色在线视频看看| 啊啊嗯网站视频| 野花日本视频免费观看3| 日韩美美女在线观看视频| 深夜美女高潮喷白浆视频| 欧美日韩综合久久久久久| 啊用点力对就是那里视频| 岳两片蚌肉缓缓张开| 免费观看仙侣情缘电视剧| 午夜性爽视频男人的天堂| 无码高潮动态图| 九九热这里只有精品首页| 丁香五月天婷婷在线观看| 趣夜APP下载| 上流社会在线观看| 啊啊啊啊啊啊啊好大好爽| 免费国产线观看免费观看| 婷婷色国产精品视频一区| 国产一级片yw| 欧美一区二区三区在观看| 在线观看AV片永久免费| 风间中文字幕一区二区三区| 男女猛烈无遮挡免费观看| 内射国产老熟女综合导导航| 夜来香成人社区| 亲女人下面100种姿势|