1. Steel parts and steel components processing requirements

Time:[2015-2-28]  Hits:5040

1. Steel parts and steel components processing requirements:
  Cutting surface or cut surface of steel, should be no cracks, slag, stratification and greater than 1 mm of missing edge, should fully checked.
Carbon structural steel at ambient temperature is below -16 ℃, low-alloy structural steel at ambient temperature is below -12 ℃, not cold cold bending and straightening.
Steel surface after the correction, there should be a clear concave or damage, scratches depth of not more than 0.5mm, and should not be greater than the thickness of the steel allows negative deviation 1/2.

2. Steel welding requirements:
  (1) Welder
  Engaged in steel welders welding work must obtain a certificate and pass the examination. Welders welding must pass the examination within its scope the project and recognized.
  (2) Non-destructive testing
  Design requirements for full penetration of the primary and secondary weld ultrasonic testing should be used to check the internal defects, ultrasonic testing can not judge when the defect should be used radiographic inspection, and testing its internal defect classification methods should be consistent with existing national standards regulations.


3. Fasteners Requirements:
  Steel production and installation of units should be required strength bolts were even anti-slip friction coefficient test and retest the surface, the friction surfaces of the scene should be a separate component for anti-slip coefficient test results should meet the design requirements.


4. Steel and steel component assembly installation requirements:
  (1) H-beam flange plate welded seam and web seam spacing of not less than 200 mm.
  (2) cranes and crane girder trusses in place after installation should not be under the scratch.
  (3) multi-section column installation, locate the axis of each section of the column should be drawn directly on the ground to control the axis, the axis must not lead from the lower column, to avoid excessive accumulation of errors.
  (4) After completion of the steel truss structure and the overall fight after completion of the roof should be separately measured deflection, deflection, and the measured value shall not exceed 1.15 times the corresponding design values.
  (5) paint, painting several times, coating thickness shall meet the design requirements.
  (6) a thin coating fireproof paint coating thickness shall comply with the relevant requirements of the fire resistance design.


5. Steel Division project completion and acceptance requirements.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
痴女道具扩张乳孔的小说| 老太太BB毛多水多舒服| 日本中文字幕在线观看国产| 成长av片在线观看网站| 91人人妻人人做人人爽| 男女操逼的视频| 操逼视频真人大鸡巴操逼| 青娱乐免费人妻| 女被男啪到哭视频在线看| 国产精品欧美亚洲日本久久 | 啊痒用力操欧美视频内射| V无码A免费AAAAA| 黑人巨屌狂插爽夫妻电影| 久久夜色精品久久噜噜亚| 午夜亚洲国产理论片中文| 亚洲日本香蕉观看观视频| 91精品国产91热久久久| 国产老太婆精品久久久久| 欧洲日本亚洲中文字幕。| 看女人逼逼骚的流水视频| 被学长抱进小树林c个爽| 91爱爱大骚逼| 欧美性bbbbxxxxx| AV水蜜桃网站免费观看| 禁断の肉体乱爱中文字幕| 黑人大粗鸡吧插蜜穴电影| 不卡的av电影在线播放| 男朋友做完拔出来的那一刻| 鸡巴插鸡巴网站| 老王66福利网一区二区| sm调教骚逼性奴动态图| 日韩美无码一区二区三区| 大鸡巴差小骚逼视频网站| 天天操天天爽曰曰啪夜夜草| 欧美 亚洲 国产 精品| 大鸡巴插入小穴在线观看| 两个人免费视频高清播放| 免费亚洲天堂免费成人av| 99热这里只有精品11| 高h秘书不许穿内裤1v1| 久久一区二区三区欧美亚洲|