娇妻借朋友高h繁交h,公交车伦流澡到高潮hnp,六月婷婷网视频在线观看,天堂√最新版中文在线

Language:CHINESESENGLISH

Home > News > Steel supervision next station control points
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.e-sosa.com

Steel supervision next station control points

Time:[2016-1-20]  Hits:4986

Guangzhou Steel teach you: Steel supervision next station control points

(1) Before the construction supervisors to deal with the approach of materials (steel, high-strength bolts) check, approach the material must have factory quality certificate and sampling site is intended for use after passing inspection, welding rod, wire, flux should meet the requirements .
(2) Check the installation of the production staff of technical welder qualification certificate, so certificates.
Welding income margin, cutting and other allowance and column in compression load deformation value (3) the material according to process requirements, making installation reserved.
(4) member when assembled, to prevent distortions member bagging inaccurate.
(5) welding to adhere to a thickness greater than 50mm carbon structural steel and low-alloy structural steel before welding larger than 36mm preheat hot after welding performed.
(6) the quality of the weld seam inspection in addition to dimensions, surface quality inspection, but also check the internal weld defects, according to the requirements of the drawing to determine the grade of weld quality grade and defects NDT.
(7) Before installing the column, a detailed examination of the relative position of the axis of the anchor bolts and offset.
(8) a single vertical column of steel columns, with one column capitals elevation sections deviations on the wrong port value under the column connection.
(9) Guangzhou Steel steel member during product delivery, product quality must have approval and certification, in order to be sent to the installation site, after installation departments for product acceptance Engineer focused on installation and connection components in place to check on the situation and members steel members connected with the concrete peg holes reservation wear bars.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
无毛白虎操逼逼视频网站| 香蕉国产精品偷在线播放| 国模大尺度一区二区91| 三十路丰满大屁股熟妇网| 护士自慰的激情黄色网站| 最近中文字幕免费大全8| 最新AV中文字幕在线看| 透烂美女出水嫩逼嗷嗷叫| 三级国产国语三级在线2| 国产亲近乱子伦免费视频| 亚洲欧美人成综合在线另| 欧美黑人狂躁日本妞| 享受隔壁黑人带来的满足| 免费看片无码中文字幕网| 亚洲女人天堂a在线播放| 小早川在线一区二区三区| 91久久熟女人人爽系列| 国产最爽的视频国语对白| 国产一道本在线免费视频| 操骚屄成人免费在线视频| 影音先锋aⅤ无码资源网| japanese老熟妇乱子伦视频| 日本地区不卡高清更新二区| 久久久综合网| 狼人大香伊蕉在人线国产| 越看水流的越多的故事| 欧美一级黄色片| 中文字幕av日韩精品一区| 鲁鲁视频www一区二区| 日韩精品中文字幕一区二| 欧洲精品色在线视频看看| 久久久AB手机播放婷婷| 黑人狂躁日本妞中文字幕| 亚洲美女欧洲美女性毛片| 熟女丰满老熟女熟妇| 帅小伙打飞机在日B毛片| 少妇厨房愉情理伦片HD| 成人作爱性生交大兔费看| 老女人用润滑油日比视频| 国产营养-A-鸡鸡大片| 久久人人槡人妻人人玩夜色av |