娇妻借朋友高h繁交h,公交车伦流澡到高潮hnp,六月婷婷网视频在线观看,天堂√最新版中文在线

Language:CHINESESENGLISH

Home > News > raw materials and finished steel structure approach
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.e-sosa.com

raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:5068

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
被黑人猛烈进出到抽搐动态图| 精品人妻一区二区三区伊人| 一级欧美黄片欧美一级黄片| 性色AV一二三天美传媒| 免费日韩精品影片在线播放| 中文字幕日韩精品第一页| 456久久华人少妇3p| 黑人长吊video残忍| 电影日韩中字熟妇人妻av| 亚洲精品一区二区另类图片| 扒开双腿疯狂进出爽爽爽| 妽妽用身体满足了我| 中国操逼对白网站Www| 寺庙双乳高耸嗯啊h| 日韩精品一区二区视频在线| 26uuuu高清成人日韩| 一整晚持续高潮喷水AV| 猛男把模特操得下面流水| 哪个网站可以看黄色av| 他跨越山海而来| 国语精品成人免费在线视频| 91操美女网站在线观看| 中文字幕天天干| 国产精品久久久久久影院| 少妇被大鸡巴插| 久久中文字幕av第二页| 亚洲va中文字幕欧美2| 色噜噜国产精品一区二区| 日本一区二区三区a视频v| 黑人大鸡吧专区| 一级女人18毛片水真多| 久章草在线视频播放免费| 国产spank视频网站| 精品一区二区三区东京热| 大尺度av在线免费观看| 羞羞国产污污无遮挡网站| 91色免费在线观看国产| 成人 在线 亚洲 欧洲| 伊人思思久99久女女精品视频| 国产电影一区二区8888| 黑龙江美女操逼操小嫩逼|