娇妻借朋友高h繁交h,公交车伦流澡到高潮hnp,六月婷婷网视频在线观看,天堂√最新版中文在线

Language:CHINESESENGLISH

Home > News > Steel construction work Technical Exchange
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.e-sosa.com

Steel construction work Technical Exchange

Time:[2016-3-5]  Hits:5107

Guangzhou Steel News: Steel construction work Technical Exchange


Tests, content:
1. Guangzhou Steel construction personnel should be familiar with this type of work safety rules and technical skills to work, conduct disorder safety tests, education, job before the job is not suited to high-altitude, high-altitude operations personnel can not engage in prohibited entering the construction workers must be used correctly personal protective equipment. Qualified to wear helmets, fasten your chin buckle locking good. Climbing (2m or more) must wear seat belt hanging qualified jobs, with low hanging hung securely. Forbidden to wear slippers or plastic-soled shoes high-altitude operations, Do not drink and work.
2. electric welding operations, to holders of operating permits, fire permits and clean up around the inflammable and explosive materials, oxygen, acetylene bottles spacing distance should be consistent with the work specifications, welding wire should be in place, staffed with qualified and effective fire-fighting equipment , set up specifically to see the fire. Welder by a professional electrician complete disassembly, and what does not prohibit the operation of machinery and equipment.
3. Do not live operation, with a load connected to power lines is prohibited.
4. climbing operations must be worn tool bag, wearing non-slip shoes, tools, tool bag should be placed, not free on a steel beam or a place easily lost if the handheld tools (such as hammers, wrenches, pry bar, etc.) to put on a safety rope to prevent the loss hurt.
5. Field workers smoking, chasing. Special types of work must be certified.
6. Non-professionals shall not engage in electrical work, temporary overhead power lines laying, and good insulation measures to prevent scratch, hit, hit cable.
7. sling must be checked before use, do not meet safety requirements prohibited.
8. The lifting work full-time workers command signal, high lifting must be clearly visible semaphore or flute and intercom command, to be set up at the sight of two blind lifting operations command.
9. hanging objects at 0.3m from the ground when the lifting rigging inspection, determined safe before lifting, and crane overload operation is prohibited.
10. When lifting member, non-stop or put the container member scattered Unloaded member.
11. At the bottom of the arm member and play a major twist area, may not have staff to stay around.
12. The pull member seated in the cable should help in place, this time staff member should stand on both sides.
13. member in place, should be a fixed installation or post weld welding, non-use of temporary stacking, hold way to prevent accidents and falls from a height, must be firmly welded in place immediately after.
14. Canton steel operations use electrical equipment, to be done to stop people walking machines wind up its power before they can not stay hidden.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
日本aa免费电影一区二区| 被人爆操内射进去的视频| 白日美人无删减完整视频| 久久香蕉免费国产天天看| 欧美vivo18| 亚洲色精品VR一区二区| 粉嫩粉嫩的18在线观看| 日韩精品免费av在线播放| 少妇被黑人爽到高潮喷水| 国产特级黄色片| 免费直接在线看亚洲黄色| 国产日产久久高清欧美一区| 91欧美一区二区三区人| 草翻你的小逼逼| 国产又硬又粗又长又黄视频| 国内精品一区二区三区视频| 精品久久久久久久久久熟女| 无码人妻21p| 核xp工厂精品久久亚洲| 成人免费网站久久久樱花| 色婷婷视频免费在线观看| 欧美熟妇xxxxx极品| 伸进同桌奶罩里摸她胸作文| 国产 中文 欧美 日韩| 成人短视频在线观看视频| 欧美大片欧美激情性色a∨| 日产精品久久久一区二区| 一级a爱片国产亚洲精品| 国产av资源站| 白少洁第1一40章免费阅读| 国产精品美女久久久| 男人大鸡巴日逼视频免费| 国产精品亚洲欧自偷片专区| 性色在线播放免费人成片| 被快递员揉搓奶头的小说| 97久久久久人妻精品专区| 男人女人免费啪啪无遮挡| 365天今时之欲| 日本一区二区三区国产欧美| 中文字幕一区二区三区蜜月| 朝鲜女子内射杂交BBW|