Housing Construction - large steel structure construction technology of installation of slip

Time:[2016-3-19]  Hits:4707

Guangzhou Steel tells you: Housing Construction - large steel structure construction technology of installation of slip

Guangzhou Steel News 1. Main content
Computer-controlled mass jacking and lifting technology is an advanced steel structure and installation of large equipment technology, which combines mechanical, hydraulic, computer control, sensor monitoring technology, and technology to solve the traditional hoisting of large crane and lifting machinery height, weight lifting, structure, surface contact, job sites and other fields insurmountable problems. With this construction technique is safe and reliable, mature technology, advanced technology, significant economic benefits. The technology uses a "flexible strand bearing, hydraulic cylinder cluster, computer-controlled synchronous lifting" principle. When lifting or jacking construction precisely controlled by computer at various points synchronization.
2. Technical Specifications
Lifting or jacking determine the program, you must also consider the load-bearing structure (permanent or temporary) and the lifting device itself or the steel strength, stiffness and stability. To make the overall force structure under construction state of stress performance checking and calculating all, to mention points with jack. For construction of foundation and support structure or the lower should be checking the bearing capacity and the overall stability, guaranteed under the most unfavorable conditions sufficient security. Sync value of each action point should be selected by calculating the reasonable construction.
Ways to enhance the principle of choice, one seeks to reduce the height of the load-bearing structure, to ensure its stability, the second is to ensure that the steel structure or equipment was promoted stability and security in place in ascension. Determine lifting points of the number and location of the basic principles are: First, to ensure that equipment is lifted steel or stability during the lift of. In ensuring the safety and quality of the premise, to minimize the lifting points. Enhance the carrying capacity of the device itself meet the design requirements. Lifting equipment selection principles are: to meet the upgrade requirements of the force, compact, durable, easy maintenance, meet the engineering needs (such as stroke, enhance the speed, security, etc.).
Main technical characteristics 3. Slip law
Sliding method has broad applicability. In addition to one-way truss, the structural rigidity for the smaller two-way truss or truss by adding support points (decrease span), increase the width of the assembly platform, while increasing the number of truss assembly on the platform, the same method can be used to install slip.
Slip propulsion device can be computer-controlled synchronized hydraulic crawler. High degree of automation equipment, flexible operation, safety, and high reliability, using a wide versatility.
4. The main technical measures slip law
1) preparation of construction plan
Preparation of construction plan to guide the construction, comprising: a sliding unit division, and slide assembly platform erection, assembly height, traction system, points slip or cumulative slip, off the shelf in place, construction monitoring, contingency plans.
2) high-altitude platform assembly and erection truss assembly.
3) Set the sliding track.
4) Install the synchronization slip system.
5) stress and strain monitoring: to ensure the construction in a controlled state.
5. Scope
(1) sports stadiums, theaters, hangars, steel bridge (gallery) and other large span roof and steel structure assembled with a ground conditions, when there are better peripheral support conditions, and can be used to enhance the overall lifting technology.
(2) enhancing the overall steel tower antenna masts, power station boilers and other ultra member.
Enhancing the overall (3) large gantry crane girder, boilers and other large equipment.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
尹人久久综合综合热精品 | 九九热视频在线免费播放| 午夜少妇一夜情一区二区| 天天躁日日躁狠狠躁超碰| 操逼自慰大胸大鸡巴激情| 操操操操操操操操操逼逼| 肥熟女and黑人大鸡吧| 口爆深喉老熟女| 在线不卡日本一区二区视频| 美女嗯啊操在线免费观看| 欧美一级午夜做片性视频| 91亚洲国产成人精品福利| 在线播放免费黄片亚洲区| 丰满阴户逼视频| cao死你个小骚逼视频| 色综合久久久久金8天国| 女生被猛插视频| 久久久久久久精品免费看a片| 亚洲激情成人网| 国产成人久久一区二区不卡三区| 免费看的黄色视频日逼的| 亚洲无专久久久欧精品区一| 最新福利小视频在线播放| 亚洲av网站免费在线看| 中文 欧美 日韩 在线| 精品国产片一区二区三区| 欧美 国亚洲性色综合区| 国产成人女免费在线观看| 日韩一区二区三区视频播放| 中文字幕不卡av在线播放| 男人爱看的网站| 国产一级二级三级在线电影| 精品久久久久久久av电影| 啊啊啊大鸡巴插骚逼视频| 绝伦の上司に一晚人妻| 久久久久免费看一级毛片| 亚洲精品午夜无码电影网| 日韩久久久久久久久不卡| 女同性恋精品一区二区三区| 琪琪成人影视啪啪成人片| 日韩欧美精品少妇一区二区 |