Large Steel Sliding Installation Technology of

Time:[2016-3-23]  Hits:4345

Large Steel Sliding Installation Technology of


1. Guangzhou Steel Main content
Computer-controlled mass jacking and lifting technology is an advanced steel structure and installation of large equipment technology, which combines mechanical, hydraulic, computer control, sensor monitoring technology, and technology to solve the traditional hoisting of large crane and lifting machinery height, weight lifting, structure, surface contact, job sites and other fields insurmountable problems. With this construction technique is safe and reliable, mature technology, advanced technology, significant economic benefits. The technology uses a "flexible strand bearing, hydraulic cylinder cluster, computer-controlled synchronous lifting" principle. When lifting or jacking construction precisely controlled by computer at various points synchronization.
2. Guangzhou Steel Technical Specifications
Lifting or jacking determine the program, you must also consider the load-bearing structure (permanent or temporary) and the lifting device itself or the steel strength, stiffness and stability. To make the overall force structure under construction state of stress performance checking and calculating all, to mention points with jack. For construction of foundation and support structure or the lower should be checking the bearing capacity and the overall stability, guaranteed under the most unfavorable conditions sufficient security. Sync value of each action point should be selected by calculating the reasonable construction.
Ways to enhance the principle of choice, one seeks to reduce the height of the load-bearing structure, to ensure its stability, the second is to ensure that the steel structure or equipment was promoted stability and security in place in ascension. Determine lifting points of the number and location of the basic principles are: First, to ensure that equipment is lifted steel or stability during the lift of. In ensuring the safety and quality of the premise, to minimize the lifting points. Enhance the carrying capacity of the device itself meet the design requirements. Lifting equipment selection principles are: to meet the upgrade requirements of the force, compact, durable, easy maintenance, meet the engineering needs (such as stroke, enhance the speed, security, etc.).
Main technical characteristics 3. Slip law
Sliding method has broad applicability. In addition to one-way truss, the structural rigidity for the smaller two-way truss or truss by adding support points (decrease span), increase the width of the assembly platform, while increasing the number of truss assembly on the platform, the same method can be used to install slip.
Slip propulsion device can be computer-controlled synchronized hydraulic crawler. High degree of automation equipment, flexible operation, safety, and high reliability, using a wide versatility.
4. The main technical measures slip law
1) preparation of Guangzhou Steel construction program
Preparation of construction plan to guide the construction, comprising: a sliding unit division, and slide assembly platform erection, assembly height, traction system, points slip or cumulative slip, off the shelf in place, construction monitoring, contingency plans.
2) high-altitude platform assembly and erection truss assembly.
3) Set the sliding track.
4) Install the synchronization slip system.
5) stress and strain monitoring: to ensure the construction in a controlled state.
5. Guangzhou Steel Scope
(1) sports stadiums, theaters, hangars, steel bridge (gallery) and other large span roof and steel structure assembled with a ground conditions, when there are better peripheral support conditions, and can be used to enhance the overall lifting technology.
(2) enhancing the overall steel tower antenna masts, power station boilers and other ultra member.
Enhancing the overall (3) large gantry crane girder, boilers and other large equipment.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
在线看国产不卡无码视频| 在熟睡夫面前侵犯我在线播放| 人碰人碰人成人免费视频| 日韩精品一区二区三级电影| 国产一级黄片av免费看| 色777狠狠综合秋免鲁丝| 兔女郎被啪出水在线视频| 第一次窝窝人体色WWW| 男人进入女人的下部视频| 白浆大鸡巴网址| 成人欧美s视频在线观看| 中文字幕不卡av在线播放| 大鸡巴操我视频| 欧美人妻一区二区在线看| 操逼片免费播放| 大鸡巴在屁股上跃动视频| 2022av中文字幕不卡| 日韩国产亚洲欧美中文字幕| 中文字幕 丝袜人妻91| 我和小表妺在车上的乱h| 亚洲国产欧美久久香综合| 中国中老年女人操逼视频| 被部长玩的漂亮人妻在线| 久久精品a亚洲国产v高清不卡| 国产精品久久国产丁香花| 成人黄网站片免费视频网站| 人人妻天天爽夜夜爽视频| 青娱乐福利在线| 一边摸一边抽搐一进一出| 黑人长吊video残忍| 公在厨房啊灬啊灬用力啊| 鸡鸡捅逼逼免费软件大全| 欧美久久久久久又粗又大| 99视频在线看| 精品少妇久久一区二区三区| 99精品中文| 亚洲线日本一区二区三区| 欧美 日韩 亚洲 图片| 亚洲 欧美 日韩 在线| 久久九九视频这里只有精品| 久久精品国产亚洲av成人|