Foshan main steel members (b)

Time:[2016-5-14]  Hits:5445

welding
(1), the general requirements
a welder required certificates.
c welding, flux before use technical specifications shall be specified baking temperature baking.
c welding welder should be reviewed before the handling member joint quality and pads, if not meet the requirements, in order to be qualified welding after trimming.
(2) the welding process
a Before welding, construction workers assessed according to the process of compilation of the welding process instructions, specific guidance welder welding work.
b raining or snowing non-open-air welding.
c positioning welders should have Welder certification, welding materials used should tack welding and welding materials the same official, tack welding may not have pores, cracks, slag and other defects.
d same position should not exceed twice the number of weld repair.
(3), H-beam welding
All members of the project H-beam welding using LMZ-1500 automatic gantry welding machine, automatic submerged arc welding, gas shielded welding machine welding, to avoid weld, slag, weld defects.


test
(1) After completion of the processing member, in accordance with the processing map and (GB50205-2001) of the relevant provisions into acceptance.
(2), member acceptance criteria for the acceptance of construction quality of steel structures (GB50205-2001) and construction drawings.

Painting, NO
(1), the general requirements
a member rust and paint work should be carried out after the quality inspection qualified member.
b Painting Lobe coating construction personnel professional training, after familiar with the performance of coatings and coating job essentials, before construction.
(2), the management coatings
A variety of coating materials of different specifications should meet the design requirements.
b component coating technology used must comply with the conditions of professional standards, and product certification. Over use of custody of the paint should be re-inspection, qualified before use.

Factory
Lifting member according to plan will be qualified batches packaged, transported to the site.

Admission preparation
(1), construction workers and related personnel arrived at the construction site preparation work before installation.
(2), the former construction workers were entering education, quality, duration, safety and other aspects of the work to fully implement the team, for all the difficulties of design drawings, construction program, focusing on a comprehensive understanding.
(3), with the Party-site tests, such as raw materials, components, and equipment disposal site access road, water, electricity, housing, construction coordination and determine the amount of each process and construction plans, and other construction units Cross Operations Coordination plan.
(4) of the construction process (base buried and associated facilities) for review, to ensure the quality of embedded parts, elevation, the central axis, geometry, parallel degree correct. Do the handover procedures.
(5), according to the requirements of the steel works, ready to upgrade machinery, equipment, tools, materials planning and special tools; equipment to do the preparatory work and auxiliary materials, such as cranes, welding machines, measuring instruments, hand tools and other aids , implement vertical transport conditions.
(6), inspection and acceptance steel components positioning axis, elevation, and make the steel member installation guides actinomycetes work;
(7), is responsible for the installation of steel components transport lifting, positioning, calibration, fastening bolt, seam welding installation work;
(8), according to the actual situation of the construction work planned to make necessary adjustments and additions and submitted to the project manager for approval.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
性xxxx欧美老妇胖老大| 我美艳丰满的吗咪| 各种作爱视频| 青青久久AV资源绿巨人| 校园现代激情亚洲中文字幕| 萌白酱jk制服透明白丝| 国产精品一区二区三区性色| 骚逼女视频网站| 欧美乱大交xx潮喷兔费| 青青操免费公开在线视频| 福利久久久久久一区二区| 大鸡鸡插插shipin| H精品动漫在线无码播放| 一女被五男在别墅调教| 男生插入女生阴道的视频| 五月天婷婷网址| 夜间视频大鸡巴抽插兽奸| 无遮挡粉嫩久久久久久久| 小水嫩精品福利视频导航| 白嫩欧美美女被巨屌抽插| 成人黄网站免费app快| 国语自产拍在线视频一区| 教室停电 挺进她体内h| 美女骚成人网站| 好大好硬好粗好深的视频| 可以在线观看的国产精品| 成人免费gaoqing| BBW性爱喷水视频在线| 性欧美丰满熟妇xxbb| 男人jj插女人阴道网站| 无码网站黑人在线观看。| 欧美白虎j插p| 免费真实播放国产伦视频| 日本女人操逼怪物的鸡巴| 亚洲AⅤ中文无码字幕色| 色av色av色av偷拍| 婷婷综合久久中文字幕蜜桃三电影| 五月激情综合丁香色婷婷| 国产3D彩漫活蒸赵雨璐| 《私密按摩师》在线观看| 老司机无码深夜福利电影|