娇妻借朋友高h繁交h,公交车伦流澡到高潮hnp,六月婷婷网视频在线观看,天堂√最新版中文在线

Language:CHINESESENGLISH

Home > News > Common problems of Foshan steel structure column base installation
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.e-sosa.com

Common problems of Foshan steel structure column base installation

Time:[2021-4-7]  Hits:3271

Installation of column base

 

(1) Embedded parts (anchor bolt) problems: overall or layout deviation; elevation error; screw thread without protective measures. The bolt holes on the bottom plate of the steel column are directly out of alignment, resulting in insufficient thread length.

 

Measures: the steel structure construction unit cooperates with the civil construction unit to complete the embedded parts work, before the concrete pouring and tamping. Relevant dimensions must be rechecked and fixed firmly.

 

(2) The phenomenon of anchor bolt not vertical: the horizontal degree of the base plate of frame column column foot is poor, the anchor bolt is not vertical, and the horizontal error of embedded anchor bolt is too large after foundation construction. The columns are not in a straight line after installation, which makes the appearance of the house difficult to see, brings errors to the steel column installation, and affects the structural stress, which does not meet the requirements of the construction acceptance specification.

 

Measures: the anchor bolt installation should adhere to the bottom plate leveling with the lower adjustment bolt, and then the secondary grouting of non shrinkage mortar, and the construction method abroad. Therefore, during the construction of anchor bolt, steel bar or angle steel can be used to fix anchor bolt. Welding into a cage, improving the support, or taking some other effective measures to avoid the anchor bolt moving one place when pouring the foundation concrete.

 

(3) Anchor bolt connection problems: the anchor bolt of column base is not tightened, the base plate is not welded with the bottom plate; some anchor bolts with 2-3 threads are not exposed.

 

Measures: Welding bolts and nuts shall be adopted; outside chemical anchor bolts, fire-proof coating and heat insulation treatment shall be added to prevent the anchorage performance from being affected by fire; observation data of foundation settlement shall be supplemented.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
成人性视频免费在线观看| 中文字幕a久久一区二区| 婷婷久久精品国产一区二区| 日韩无码窝白虎肏屄视频| 亚洲口爆吞精一区一青草| 男阴茎插入女阴道电影片| 国产免费久久精品老女人| 色色色色色熟老女人视频| 干鸡巴视频中国| 国产另类图片综合区小说| 亚洲乱码中文字幕一线区| 高冷男总裁憋尿被揉下面| 成 人 亚洲 综合天堂| 国内不卡的一区二区三区| 久久亚洲精品国产精品婷婷| 日韩欧美一区二区三区不学| 国产使劲cao视频在线| 黑人的粗黑大吊| 码精品一区二区三区四区| 啊啊啊大鸡巴操小穴视频| 同房之后第二天白带发黄| 大黑鸡巴破处血淋淋视频| 进入黄色网站看男女操逼| 一区二区三区日本免费视频| 鱼塘水质一直都是黄浑色 | 青娱乐在线极品| 亚洲 少妇 不卡小视频| 日本人妻熟妇久久久久久| 白人干人妻被干| 另一类ZOOM| 麻豆亚洲av成人无码久久精品| 亚洲精品一区二区三区老狼| 中文字幕av一中文字幕| 国产乱女婬AV麻豆国产| 99久久亚洲国产精品观看| 外国人用肉棒戳女人下体| 男人草女人骚逼免费视频| 韩国三级丰满少妇高潮| 亚洲av黄片在线免费看| 把美女操了视频不用下载| 亚洲天堂网一区二区免费|