Seven construction processes of steel structure workshop

Time:[2021-11-13]  Hits:2497

The main process flow of steel structure plant construction is as follows:

1. Construction setting out. According to the design requirements and drawing requirements, use theodolite and level for positioning. After determining the axis and elevation, confirm the position of steel frame footing.

2. Foundation embedded parts. Before foundation concrete pouring, the embedded bolts shall be fixed according to the size, and the embedded bolts shall be wrapped in advance to avoid pollution during concrete pouring. After the completion of concrete pouring, the concrete residue at the embedded anchor rod and screw port shall be cleaned in time.

3. Steel column hoisting. First, confirm the position of component lifting points and take protective measures. After lifting the steel column, align it close to the anchor bolt, align the mounting hole with the bolt, and then slowly put down the hook. After initial calibration, tighten the bolts.

4. Steel beam installation. After the steel column is rechecked, the steel beam shall be lifted and bound symmetrically at two points. When the datum face of steel beam and steel column is on time, butt joint adjustment and correction shall be carried out, and then fixed and connected.

5. Purlin installation. The purlin generally adopts the method of one hook and multiple lifting. The error is adjusted by moving the sample bar back and forth along the purlin, tightening and loosening the bolts, and finally fixed with bolts for correction.

6. Install wallboard. Start at the gable at one end and move on to the other. At the initial stage of construction, the operation platform shall be used for transition to ensure that the top plate is parallel and installed vertically through stay wire. It is best to form at one time and handle it with care to avoid scratching.

7. Workshop painting. First remove the stains on the metal surface, and then apply antirust paint. After the antirust paint is dry, start puttying. After the putty is completely dry, it shall be polished and leveled. Finally, apply anti phosphating primer.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
亚洲AV无码区二区三区| 丰满少妇被粗暴猛烈进入| 日本黄色网站黄色片视频| 98在线视频噜噜噜国产| 从后面抱住使劲日逼视频| 国产九九九九九九九a片| 色偷偷的亚洲男人的天堂| 三级片在线黄色| 免费视频裸体无遮挡男女| 2019国产品在线观看| 我操了大胸美女扫货网站| 国产成人综合亚洲欧在线| 阴茎插:阴道视频爽啪啪| 久久久久精品国产三级蜜奴| 水户香奈亚洲视区频在线| 2019久久久男人天堂| 色欲色香天天天综合无码| 国产 自拍 欧美 在线| 色婷婷综合视频在线观看| 青青草激情视频在线播放| 粉嫩一区二区三区色综合| 在线播放无码成动漫视频| 成人精品一区二三区熟女| 美女+光屁屁+阴道自慰| 91啦中文字幕| 中文无码成人精品久久久久| 被男人吃奶添下面好舒服| 欧美乱码1区2区3区久久| 亚洲综合一区二区三区无码| 大鸡巴婊子骚逼| 欧美肥臀XXXXX操逼| 色呦呦视频在线免费播放| 日本小泽玛利亚在线观看| 老司机AV午夜福利精品| 骚女沉沦性奴求大鸡巴操| 精品久久久久久久亚洲偷拍| 日本亚洲成人中文激情网| 国产精品久久久久久不久| 嘿嘿射在线观看| 校花娇躯被学长抽搐呻吟| 日本插小穴视频|